{"product_id":"100pcs-5mm-blue-lights-led-diodes-blue-lens-diffused-round-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bulb-lamps-light-emitting-diode-color-07-blue-blue-100pcs-style-5mm-constant-light","title":"100pcs 5mm Blue Lights LED Diodes (Blue Lens) Diffused Round Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode - color: [07] Blue-blue \/ 100pcs, style: 5mm Constant Light","description":"\u003ch3\u003eAbout this item\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n\u003cli\u003eProduct Features: Blue Lights \/ 5mm Diffused Round Lens \/ Blue Lens\u003c\/li\u003e\n\u003cli\u003eProduct Parameters: 29mm Long Lead \/ DC 3.0V - 3.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n\u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 460nm-470nm \/ 120° Viewing Angle \/ Single LED Diodes Wight: 0.29g\u003c\/li\u003e\n\u003cli\u003eAccessories: 100pcs 430ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ ±1% Tolerance\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eOverview\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eBrand:\u003c\/strong\u003e EDGELEC\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLight Type:\u003c\/strong\u003e LED\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecial Feature:\u003c\/strong\u003e Instant On\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBulb Shape Size:\u003c\/strong\u003e F10\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBulb Base:\u003c\/strong\u003e E26\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"EDGELEC","offers":[{"title":"Default Title","offer_id":48201190932631,"sku":"B077X9582D-color-07-blue-blue-100pcs-style-5mm-constant-light","price":11.6,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0735\/1032\/2327\/files\/41pmyHteBrL.jpg?v=1788467897","url":"https:\/\/tinkervanta.com\/products\/100pcs-5mm-blue-lights-led-diodes-blue-lens-diffused-round-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bulb-lamps-light-emitting-diode-color-07-blue-blue-100pcs-style-5mm-constant-light","provider":"TinkerVanta","version":"1.0","type":"link"}