{"product_id":"100pcs-3mm-warm-white-flicker-flickering-led-diodes-candle-flicking-lights-clear-round-lens-29mm-long-lead-dc-3v-20ma-light-emitting-diode-lamp-bulb-color-warm-white-100pcs-size-3mm-flickering-light","title":"100pcs 3mm Warm White Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 3V 20mA Light Emitting Diode Lamp Bulb - color: Warm White \/ 100pcs, size: 3mm Flickering Light","description":"\u003ch3\u003eAbout this item\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003eMicro led 2pin 2 pin Leads\u003c\/li\u003e\n\u003cli\u003eClear Transparent Round Small Lens\u003c\/li\u003e\n\u003cli\u003eParameters : DC 3 - 3.2 Volt 20 mA, Polarity (3 V) : Anode \"+\" (Longer Leg) | Cathode \"-\" (Shorter Leg)\u003c\/li\u003e\n\u003cli\u003ePackage: Pack of 100 Pieces led diode(Through Hole DIP 2pins leads mini LEDs Set)\u003c\/li\u003e\n\u003cli\u003eCompatible with: Flickering Indicator, DIY PCB Board Circuit, Arduino, Raspberry Pi, Hobby, Science Experiments, Throwies Project, Breadboard\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eOverview\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eBrand:\u003c\/strong\u003e Vrabocry\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLight Type:\u003c\/strong\u003e LED\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecial Feature:\u003c\/strong\u003e Energy Efficient\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBulb Shape Size:\u003c\/strong\u003e B10\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBulb Base:\u003c\/strong\u003e E26\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Brand: Vrabocry","offers":[{"title":"Default Title","offer_id":48201904128151,"sku":"B0FRM29B7K-color-warm-white-100pcs-size-3mm-flickering-light","price":14.11,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0735\/1032\/2327\/files\/31BGTcCAMUL_8b819c3b-8dfe-483a-8ebb-abb6a07b0099.jpg?v=1788495557","url":"https:\/\/tinkervanta.com\/products\/100pcs-3mm-warm-white-flicker-flickering-led-diodes-candle-flicking-lights-clear-round-lens-29mm-long-lead-dc-3v-20ma-light-emitting-diode-lamp-bulb-color-warm-white-100pcs-size-3mm-flickering-light","provider":"TinkerVanta","version":"1.0","type":"link"}